STREET & BUILDING The October 2025 Development Review Permit set presents a self-storage facility through site context, building views and architectural drawings. The project is shown at its documented review stage, with office-team attribution.

OPEN IN THE UNIVERSE ↗
FIG. 01 / DRAWING SET / PAGE 07 / Professional practice / project team
Santa Monica, California / Development Review Permit drawing set, October 24, 2025

STREET & BUILDING

The October 2025 Development Review Permit set presents a self-storage facility through site context, building views and architectural drawings. The project is shown at its documented review stage, with office-team attribution.

FIG. 02 / DRAWING SET / PAGE 04 / Professional practice / project team
FIG. 03 / DRAWING SET / PAGE 09 / Professional practice / project team
FIG. 04 / DRAWING SET / PAGE 10 / Professional practice / project team
FIG. 05 / DRAWING SET / PAGE 11 / Professional practice / project team

ORGANIZING THE PLAN

Ground, basement, upper-floor and roof plans show the relationship between customer-facing functions, service circulation and storage areas.

FIG. 06 / DRAWING SET / PAGE 12 / Professional practice / project team
FIG. 07 / DRAWING SET / PAGE 13 / Professional practice / project team
FIG. 08 / DRAWING SET / PAGE 14 / Professional practice / project team
FIG. 09 / DRAWING SET / PAGE 17 / Professional practice / project team
FIG. 10 / DRAWING SET / PAGE 20 / Professional practice / project team

FACADE & SECTION

Facade studies and sections explain the horizontal openings, screened frontage and the relationship between the street edge and interior levels.

FIG. 11 / DRAWING SET / PAGE 21 / Professional practice / project team
FIG. 12 / DRAWING SET / PAGE 22 / Professional practice / project team
FIG. 13 / DRAWING SET / PAGE 23 / Professional practice / project team
FIG. 14 / DRAWING SET / PAGE 24 / Professional practice / project team
FIG. 15 / DRAWING SET / PAGE 25 / Professional practice / project team

LAYOUT STUDIES

The Storage Planner routine was also applied on this project. Its interface documentation is shown separately using the Seward working model, with the model context stated in each caption.