CLINIC, CIRCULATION & DAILY USE
The project archive traces a clinical interior from the December 2024 drawing set to completed-clinic photographs, alongside a separate November 2025 MRI construction-document scope. Plans, accessibility studies and built spaces are kept in their respective stages.
Covina, California / Clinic set: December 13, 2024 / MRI construction documents: November 4, 2025 / Completed-clinic photographs
CLINIC, CIRCULATION & DAILY USE
The project archive traces a clinical interior from the December 2024 drawing set to completed-clinic photographs, alongside a separate November 2025 MRI construction-document scope. Plans, accessibility studies and built spaces are kept in their respective stages.
Life-safety, site, proposed-floor and reflected-ceiling plans establish the clinical layout. Door, finish and enlarged-room drawings carry the organization into documentation scale.
FIG. 05 / DRAWING SET / PAGE 13 / Professional practice / project teamFIG. 06 / DRAWING SET / PAGE 14 / Professional practice / project teamFIG. 07 / DRAWING SET / PAGE 17 / Professional practice / project teamFIG. 08 / DRAWING SET / PAGE 18 / Professional practice / project teamFIG. 09 / DRAWING SET / PAGE 19 / Professional practice / project teamFIG. 10 / DRAWING SET / PAGE 20 / Professional practice / project teamFIG. 11 / DRAWING SET / PAGE 21 / Professional practice / project teamFIG. 12 / DRAWING SET / PAGE 22 / Professional practice / project teamFIG. 13 / DRAWING SET / PAGE 23 / Professional practice / project teamFIG. 14 / DRAWING SET / PAGE 24 / Professional practice / project teamFIG. 15 / DRAWING SET / PAGE 25 / Professional practice / project team
MRI DOCUMENTATION / 2025
The later MRI set is presented separately: plans, reflected ceilings, enlarged drawings, sections and details document the 2025 scope. The completed-clinic images document the earlier clinical-interior scope.
FIG. 16 / DRAWING SET / PAGE 13 / Professional practice / project teamFIG. 17 / DRAWING SET / PAGE 14 / Professional practice / project teamFIG. 18 / DRAWING SET / PAGE 17 / Professional practice / project teamFIG. 19 / DRAWING SET / PAGE 18 / Professional practice / project teamFIG. 20 / DRAWING SET / PAGE 19 / Professional practice / project teamFIG. 21 / DRAWING SET / PAGE 20 / Professional practice / project teamFIG. 22 / DRAWING SET / PAGE 22 / Professional practice / project teamFIG. 23 / DRAWING SET / PAGE 23 / Professional practice / project teamFIG. 24 / DRAWING SET / PAGE 24 / Professional practice / project teamFIG. 25 / DRAWING SET / PAGE 25 / Professional practice / project teamFIG. 26 / DRAWING SET / PAGE 26 / Professional practice / project teamFIG. 27 / DRAWING SET / PAGE 27 / Professional practice / project team
ACCESSIBILITY REVIEW
ADA Checker was demonstrated on a working model of this project in September 2026. It measures and flags candidate issues for designer review, with project-specific decisions retained by the designer.
FIG. 28 / ADA Checker / Village Oaks working model / RETROSPECTIVE CAPTURE 2026.09 / In-house routine and study model: Wei-Huan Chueh / professional practiceFIG. 29 / ADA Checker / examination-room clearance probes / RETROSPECTIVE CAPTURE 2026.09 / In-house routine and study model: Wei-Huan Chueh / professional practice
COMPLETED CLINIC
Selected photographs from the supplied project archive show reception, waiting, circulation, examination and treatment spaces. Photograph dates are not specified in the archive.